Jump to content

Stress at christmas


Arron yeates
 Share

Recommended Posts

Been renorvating the house for the last few years gutting every room back to ceiling joists, new floorboards. Moving door frames. Nocking walls down new plaster on every wall. Re wireing, new plumbing.. you name it all by our selfs lools mint like a new shoe home. Glass stair case the lot. Moved onto the kitchen did all the main work but brought the kitchen from a local kitchen firm and they were to supply and fit etc all done in 2 days and then wait 5 days for the worktop once the template was made etc... 4 weeks later only just kind of got the appliances and worktop fitted... its chriatmas eve tomorrow and the crappy push fit conectors theys plumbed the new AEG wash/dryer in with are leaking. Second visit to fix today and again still leaking... pain in the back side so close to christmas the stress its caused for the last month has been horrible... rant over lol

Link to comment
Share on other sites

I feel you pain.

I've been trying to get a place of mine finished for 2 years!! Roof off and replaced, 3 extensions, big dig out in garden including retaining walls etc, complete re-wire, re-plumb, skimmed, kitchen, bathrooms, stairs(3 attempts as I didn't like them once in), lots of steels to open up the ground floor and get in a 6m bifold door....a lot of work especially when actual paying work has been so busy.

Didn't quite get it all finished but promised mrs Edd that we'd be in this Xmas so we are.

Tonight is our second night and I've just found that the shower in the master ensuite isn't working. We can live with the others for now but not something I wanted to find.

If it's the worst thing that happens I won't mind too much.

Hope your kitchen get a sorted.

 

Edd

Edited by eddoakley
Link to comment
Share on other sites

8 hours ago, eddoakley said:

I feel you pain.

I've been trying to get a place of mine finished for 2 years!! Roof off and replaced, 3 extensions, big dig out in garden including retaining walls etc, complete re-wire, re-plumb, skimmed, kitchen, bathrooms, stairs(3 attempts as I didn't like them once in), lots of steels to open up the ground floor and get in a 6m bifold door....a lot of work especially when actual paying work has been so busy.

Didn't quite get it all finished but promised mrs Edd that we'd be in this Xmas so we are.

Tonight is our second night and I've just found that the shower in the master ensuite isn't working. We can live with the others for now but not something I wanted to find.

If it's the worst thing that happens I won't mind too much.

Hope your kitchen get a sorted.

 

Edd

Always fun when and more stressfull when your on a promise. Do you get time to shoot lol its certsinly effected my spare time lol. Found working ecery day and weekends quitestressfull for thd last few years. The idea of getting a subby who specialise in kitchens to help would save stress and speed things up. Nahhhhhh lol. They guys doing the work were great. The boss of the company is slow and you dont seem priororty at all

Link to comment
Share on other sites

That’s nothing you should be a builder who quotes 12-14 weeks for work to be completed end of January  and clients turn round after changing there mind several times and then expect all work finished for Christmas!! And thereChristmas starts mid December  bloody custards!!

Link to comment
Share on other sites

On 24/12/2019 at 06:58, Arron yeates said:

Always fun when and more stressfull when your on a promise. Do you get time to shoot lol its certsinly effected my spare time lol. Found working ecery day and weekends quitestressfull for thd last few years. The idea of getting a subby who specialise in kitchens to help would save stress and speed things up. Nahhhhhh lol. They guys doing the work were great. The boss of the company is slow and you dont seem priororty at all

No time for shooting or anything else.

Its been a lot of work, should really have been finished ages ago but I've been fitting it in around work. 

I wasn't too bothered about moving in but Mrs Edd has been desperate to move so I promised Xmas. There's a lot more left to do that I didn't want to have to do when here because it's much harder but at least we made it in for Xmas. Don't think I would have survived if we hadn't!

 

Edd

Link to comment
Share on other sites

8 hours ago, eddoakley said:

No time for shooting or anything else.

Its been a lot of work, should really have been finished ages ago but I've been fitting it in around work. 

I wasn't too bothered about moving in but Mrs Edd has been desperate to move so I promised Xmas. There's a lot more left to do that I didn't want to have to do when here because it's much harder but at least we made it in for Xmas. Don't think I would have survived if we hadn't!

 

Edd

Sounds like my life mate all been done around normal work only ive been living in it at the same time lol. Makes it worse

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...