Jump to content

Search the Community

Showing results for tags 'grass field'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Pigeon Watch Community
    • Welcome to Pigeon Watch
    • Off Topic
    • Events and Meets
    • Sporting Pictures
    • Sporting Shooting Videos
    • The Trading Post
  • Pigeon Shooting
    • Pigeon Shooting Tips
    • Pigeon Decoying Equipment
    • Talk From The Field
  • Country Sports
    • Airgunners
    • Guns & Equipment
    • Bullets, Cartridges and Reloading
    • General Shooting Matters
    • General Licence Discussion
    • Clay Pigeon Shooting
    • Other Types of Shooting
    • Gaining Permission & Shooting/Ferreting/Beating Opportunities
    • Motoring Section
    • Gamekeeping and Shoot Management
    • Country Sports
    • Dogs and Dog Training
    • Craft and DIY Section
    • Food and Drink

Product Groups

  • Shotgun & Firearms Certificate Wallets
  • Bergara Folding Shooting Seat
  • PW Merchandise

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


From


Interests

Found 1 result

  1. Hello everyone! I am looking to construct a 2 single tyre chalk track 300 meters across a field. Dimensions: 2750mm wide road, 900mm tyre tracks and a central 900mm grass verge. 300 mm deep with 200 mm hardcore on-top of a geotextile membrane and 100mm chalk or limestone consolidated in layers on top. I am looking at digging the full width trench and setting aside some soil to refill the central verge. The ground conditions currently in the field is a chalk sub-base with clay and flint deposits. My questions are; 1. Do I run the geotextile the full width of the trench, including central verge? 2. Do I fill the central verge with hardcore too, with soil / grass on-top? 3. How far do I need to take the hardcore sub-base beyond the outsides of the visible top chalk surface to avoid the track being pushed out horizontally? Any advise would be greatly appreciated, Many Thanks, Topher
×
×
  • Create New...