Jump to content

Energy Saving Scheme.


Westward
 Share

Recommended Posts

28 minutes ago, udderlyoffroad said:

The problem is not the subsea tie-back to shore, it's what happens once it gets onshore.  I've been to a certain NE-based manufacturer of subsea cables, and they too were doing load-outs near constantly.  The machinery involved, together with the constant pressure to produce is truly something to behold, and I wish I could share the pictures I have.

I'm sorry but a large offshore wind (or even onshore) wind project which has an inadequate tie to the grid is an utter failure.

 

This is exactly the problem.   The grid is inadequate, even down to individual village supplies.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...