Jump to content

stephensedgwick

Members
  • Posts

    45
  • Joined

  • Last visited

Everything posted by stephensedgwick

  1. Please don't take this the wrong way, but as I was one of many, that had the pleasure/right to run a lurcher for what it was breed for, I can not bring myself to shoot a hare, I am sure there is some on here that would agree, that to be out as the day breaks, and pit 1 dog against 1 hare is one of the best /oldest/ majestic sights you will ever see. and saying this I would say more hares got away then where killed Please don't think this is a moan, as it is not ,Its just comes from someone who would love to be able to do things, my farther and grandfather done leagally ,before someone said it cant be done anymore
  2. 60x60 needs a really flat floor otherwise no difference
  3. most contract emulsion is suitable for new plaster
  4. Where does your mate cover, as this is what it cost, Basic paver £12m sand £5 m Stone £10m muck away 250mm dig £6m kilm dried sand £1m =£34 per m add per job to this price Diamond blade + petrol Breaker +petrol digger +diesel Cement for bedding edgings concrete edgings to pathway petrol for wacker plate and nearly forgot wages At £45m your mate should be booked up for years or bankrupt within 1 ps I forgot does he walk to the job Ie truck expense's to be added I don't want to sound negative but when you crunch the numbers they speak for themselves
  5. I agree but watch the footage take the statements process ,and back to work. It don't have to be drawn out when there stopping people getting killed
  6. my advice is go with the building officer and if he's happy no problem
  7. So your other post was a case of get your facts right before you blame the innocent
  8. It still don't mean they are responsible for some one strapping a bomb on and killing people, its the same old blame anyone except the guilty ,I am sure if you was doing security and some one blew the venue up you wouldn't want to go home saying to your self I killed them people or that's my fault ,so I am sorry the people /person reasonable is the bombers
  9. I don't think be you should be blaming security
  10. Thank you for your comments
  11. I drove past there to day ,didn't notice it will take a look tomorrow
  12. Off down there in a couple of weeks for 4 days, any must do things, and good/recommended places to eat out
  13. That works out under £17 a meter you cant buy the Material's for that and 170 slabs in 4 hr =42 slabs an hr 1 every 90 seconds I would say its not possible to do
  14. so are you saying you don't have the fan working if you are running the bath
  15. I would say a fugi I'm not saying this is the best, but they make a very neat job
  16. 25 of us Came back last Saturday from Les arcs good snow and 6 days of sun shine
  17. I would say if it is half in his name its half his
  18. Just back from the south east match ,great day any one been there
  19. with this mob you pay your money and your in
  20. I could not agree more
  21. Hi I have been there a few times facilities vary each time depending what's on but never loads and are normally near the pit /work area, I don't know where the camping area is so you could be a long way from it. The parking is over looking the track so a lot of people tend to take bbq /picnic ect ,if I was you I would make sure your self sufficient .nearest chippie/kfc/tescos ect ten minutes towards Dover hope you have a good time
  22. down this way you would get change out of 5k
×
×
  • Create New...